Data centers and colocation

Every kilowatt accounted for

Sell the power you have, warn customers before maintenance and alert staff only for customer-facing problems.

Capacity boardCapacityAssets

Southeast campus

Meters read 2 min ago

Stranded capacity, estimated

340 kW

260 kW in halls C and D

Hall D utilizationby power draw92%
PUE, trailing 30 daysmeter-derived1.31
Cross-connects unreconciledbilling vs patch record7
Stranded kW by hallC · 142 kW
8 halls · estimated
Campus watch listTriaged by customer impact
  1. Cabinet D‑14 at 12.4 kW on 8.0 kW feedsLosing either feed drops the cabinetAct now
  2. Inlet temperature, cold aisle 3Within SLA, risingWatch
  3. Cross-connect billed but never patchedOrder 4471 · audit dueReconcile

Capacity you can sell

Unusable space and power found every hour, cabinet by cabinet.

  • Assets checked against billingCabinets, rack units, circuits and cross-connects matched to the meters and invoices.
  • Alarms by customer impactEach cooling or power event tied to the circuits it touches and their SLAs.
  • One place for facility dataPower readings, assets and tickets collected every hour where your team can search them.
Cabinet D‑14
Hall D · 42U · dual feed, A and B
Reconciled 14 min ago

42U · 2U per row

Feed A draw against design

5.1 kW of 8.0

Feed B draw against design

7.3 kW of 8.0

A+B load on one feed

12.4 kW of 8.0

Used

20U of 42

Billed, awaiting install

4U of 42

Redundancy held if A fails

No

Reserved

6U

Free to sell

12U

Every customer told before the maintenance window opens

Maintenance, customer-facing changes and new installs on one board, so each install starts billing sooner.

  • New installs as one jobSpace, power, cross-connects and billing tracked together, so you see what each step waits on.
  • Power quotesA new cabinet’s draw priced against the feed, cooling and breaker capacity left in its row.
  • Breaker headroomEach rack power breaker tracked against its 80% continuous-load limit.
Change board
Southeast campus · this week
22 open

Requested · 10

Cage 18Energize 4 cabinets
Order 4488Cross-connect, Hall C
Cabinet A‑03Add a 30 A circuit

Customer told · 11

CRAH 3FiltersThu 02:001 customer
Meet-me roomPanel swapSun 01:003 customers

In window · 1

Hot aisle 3Blanking panelsLive

Closed · 6

Cabinet B‑07Circuit added
Order 4402Patched and billed
PDU C‑2 · breaker at 78% of rating
Hall C · passes the 80% limit by Friday
Power
UPS 2 load bank test · Sat 22:00
Campus-wide · 14 customers told, 12 acknowledged
2 unread

Meter readings your sales team can trust

Sales quotes only the power the building can deliver.

Customer SLA clocks1 of 3 at risk

Order 4488 · 40 of 48 hours on its install SLA. A miss shows on the customer’s monthly SLA report.

Cross-connect install due 14:00, still unassigned
Paged to the shift lead with the customer’s port details and the panel it lands on

Power SLA

Met

Cooling SLA

Met

Install SLA

At risk

Reads your facility and billing data

Meter readings, assets and tickets matched to each cabinet.

SunbirdCapacity management
EcoStruxurePower monitoring
NetBoxNetwork inventory
PrometheusMonitoring
OpenSearchLog search
ServiceNowTicketing
NetSuiteBilling
SalesforceCRM
Docusign
DocusignOrder forms
Notion
NotionOperating procedures

Bring the spreadsheet that tracks capacity

From that sheet we write the plan and a fixed price.

Start a conversation